Bringing onshore wind on land requires drilling for underground lines. The Atlantic Shores power lines will need to run about 11 miles to reach Substation in Howell where power will be connected to the grid. Local
communities will be forced to live with the daily consequences:
|
Hear what Virginia beach residents have to say about the onshore wind construction process.
"Essentially they've created an industrial complex next to a residential community," Patrick McLaughlin
“In the middle of the night, I felt a big shake, and a mirror in my bathroom splintered into 100 pieces," John Knight
“I physically felt the bed moving like there was an earthquake, and I thought is there an earthquake am I losing my mind?" Deb Higgans.